ASEA designs and installs the first 400 kV AC cable – a 70 m low pressure oil-filled (LPOF) cable connecting an underground power station (built to withstand an atomic bomb) to the Swedish grid.
ASEA designs and installs the first 400 kV AC cable – a 70 m low pressure oil-filled (LPOF) cable connecting an underground power station (built to withstand an atomic bomb) to the Swedish grid.